Client Pimpri Chinchwad Municipal Corporation
Location Pimpri Chinchwad
Schedule March 2018
Funding Pimpri Chinchwad Municipal Corporation
Project Detail
PCMC intends to undertake the Water supply project of bringing the water from the Andra Dam and Bhama Askhed Dam to the Pimpri Chinchwad city through water pipeline. PCMC has prepared the Detailed Project Report for the Project with the assistance of Maharashtra Jeevan Pradhikaran. For undertaking the Project, PCMC has appointed M/s DRA Consultants Limited as a Project Management Consultant (PMC) for planning and monitoring of implementation for the project.
Scope of project is to carry out pre-tendering works, post- tendering works and the commissioning works of the following projects:
- Construction of 300 MLD capacity Water Treatment Plant.
- Construction of jackwell at Andra Dam, providing rising main upto the break pressure tank and construction of break pressure tank (BPT).
- Construction of jackwell at Bhama Askhed Dam and providing rising main upto break pressure tank.
- Providing gravity main from BPT upto Water Treatment Plant.