DRA has been providing consultancy services in Cement Plants since its inception in 1990. More than two decades now DRA has built strong relation with its clients and has been their first choice. Water is required in cement plant for different purpose like equipment cooling, spray make-up, drinking and general use. The audit of cooling water system is mainly required due to plant up gradation and over loading of existing system.
Rationalization of cooling water systems in a cement plant is carried in order to optimize the system. After audit of cement plants a lot of design irregularities are observed that result in excessive use of compressed air and cooling water along with energy wastage. Rationalization is recommended because it offers the many advantages.