Client Ministry of Urban Development
Location Chhindwara
Schedule 14-Jun-2013 To 29-Sep-2014
Funding World Bank
Project Detail
The consultant will carry out a multi-stage exercise in close collaboration with the ULB and other stakeholders. The project will be completed in two stages. Stage-I Master Plans : Preparation of master plans (of Chhindwara planning / investment area) to identify the existing conditions, projected requirements for design period and proposed solution Stage-II Detailed Project Reports : Preparation of Alternative Options on the basis of technical financial viability and preparation of detailed project reports (for Chhindwara municipal area).