Consultancy Services for Improvement and Rejuvenation of the existing Water Supply & Sewerage System & Preparation of Detailed Project Report for Water Supply and Sewerage System of 29 villages recently joined in Indore Municipal Corporation area & other related works etc. complete

Client The Superintending Engineer, Water Supply & Drainage Project Cell, Indore Municipal Corporation, Indore (M.P)
Location Indore, Madhya Pradesh
Schedule June 2016
Funding Indore Municipal Corp.

Project Detail

Indore Municipal Corporation (IMC) has prioritized Water Supply & Sewerage system in and around the city as a key area of its development agenda. Previously the city area was only 134 sq km. Now 29 villages around the Indore City were merged in Indore city limit of Indore Municipal Corporation. As per the provisions of MP Municipal Corporation Act 1968, Section 408 and MP Municipal Corporation Act 1961, Section 8 IMC would give all necessary permissions in these 29 villages and it will also be responsible for general facilities there. Therefore it is required to assess the present water supply & sewerage system of connecting villages, which is now the urban area, in order to cater present and future water supply demand & to cater the need of sewage disposal. As a part of development strategy, IMC has appointed M/s DRA Consultants Pvt. Ltd., as a Consultant for Preparing the DPR of Water Supply & Sewerage system for integrating the surrounding 29 villages of IMC to the existing system.

The Objective of the proposed work is to carry out detailed field survey of as-built existing water supply system & sewerage system vis-à-vis, approvals accorded by IMC to work out the deficiency in the execution of water supply system w.r.t., approval accorded by IMC, frame realistic cost estimates and work out modalities for IMC.

The detailed Objectives are –
1] Preparation of feasibility Report & Detailed Project Report (DPR).
2] Feasibility study of technical, financial, contractual, risk allocation, legal and operational aspects for structuring and financing model of the project.
3 Necessary Approvals at State and Central level, including those of CPHEEO, Ministry of Urban Development
4] Bid Documentation, Tendering, Clarification, Evaluation, Award Process
5] Stakeholder participation in planning and implementation for proper disclosure and consultation with all stakeholders, Stake holder involvement, & public communication.
6] Develop legal structure for performance management and regulations and in developing, administrative regulatory structure.
7] Convert intermittent water supply of Indore city to uninterrupted water supply system.
8] Reduce the water losses in transmission & distribution.
9] Improve levels of customer services.